Our reputation lies in providing exceptional solutions customised to fulfil your power plant requirements. We are thrilled to celebrate a major milestone achieved through our collaboration with Nasir Group of Industries in Bangladesh.
In 2019, we supplied, installed and commissioned 2 x 4MW (9H35DF) HYUNDAI HiMSEN TRIFUEL(HFO + Diesel + Natural Gas) engines along with BoP equipment. In 2023, both engines have successfully completed 25,000 running hours. This achievement serves as a testament to the unwavering commitment of Hyundai HiMSEN engines to long-term reliability and operational excellence with significantly lower running and maintenance costs.
Alongside the engine supply, we provided complete Balance of Plant (BOP) solutions, including:
1. HFO Purifiers: Purification of oil to remove sediments, sludges & water content.
2. HFO Boosters: Maintaining fuel pressure between 6-8 bar while ensuring viscosity and temperature requirements.
3. LO Purifiers: Enhancing the life of engine lube oil by removing impurities contained in lubricating oil.
4. Gas Compressor: Meeting the required inlet pressure of 6-7 barg.
5. Radiators: Efficient cooling of HT/LT water for the engine's optimal operation.
6. Starting Air Compressor: To provide required pressure during the engine’s initial startup.
7. Exhaust Gas Boiler: Recovering waste exhaust to generate steam, reducing costs associated with traditional steam production methods.
By offering end-to-end solutions, including installation and commissioning, OES ensured a seamless transition to reliable power generation.